收稿日期: 2015-01-21
修回日期: 2015-07-30
网络出版日期: 2015-11-20
基金资助
“塔中碳酸盐岩凝析气田上产增储一体化井位部署研究”项目资助.
Analysis of Water Injection Performance for the Carbonate Condensate Gas and Volatile Oil Reservoirs with Fractures and Caverns after Depleted Stage in Tazhong,Tarim Basin
Received date: 2015-01-21
Revised date: 2015-07-30
Online published: 2015-11-20
杨磊,韩红霞,施英,周锦明,张珑,祁英会 . 塔里木盆地塔中地区衰竭废弃缝洞型碳酸盐岩挥发油藏及凝析气藏注水效果分析[J]. 天然气地球科学, 2015 , 26(S2) : 202 -206 . DOI: 10.11764/j.issn.1672-1926.2015.S2.0202
Single well water injection-production technique has been conducted in 15 wells and two injection-production well groups have been established since 2010,aiming at energy deficiency and rapid decline during the production of fractured-cavernous carbonate condensate gas reservoirs in Tazhong,which have achieved a certain effect.Until May,2015,3.1×104t oils and 848.26×104m3gases have been produced by water injection with volume of 29.05×104m3.Meanwhile,water injection mechanism has been researched,influence factors and technique policy of single well water injection-production are analyzed and summarized,which provides a field support for recharging formation energy to enhance oil recovery of carbonate condensate gas and volatile oil reservoirs after depleted stage in Tazhong.
[1]Li Shilun,Wang Minghua,He Jiangchuan,et al.Gas and Condensate Gasfield Development[M].Beijing:Petroleum Industry Press,2004.[李士伦,王鸣华,何江川,等.气田与凝析气田开发[M].北京:石油工业出版社,2004.]
[2]Yuan Shiyi,Ye Jigen,Sun Zhidao,et al.Theory and Practice of High-efficiency Development for Condensate Gas Reservoirs[M].Beijing:Petroleum Industry Press,2003.[袁士义,叶继根,孙志道,等.凝析气藏高效开发理论与实践[M].北京:石油工业出版社,2003.]
[3]Cheng Yuanzhong,Liu Liping,Li Guojiang,et al.The research of Banqiao abandoned condensated oil and gas field by water injection[J].Natural Gas Geoscience,2003,14(4):298-301.[程远忠,刘立平,李国江,等.板桥废弃凝析气藏注水提高采收率研究[J].天然气地球科学,2003,14(4):298-301.]
[4]Xiao Yang,Kang Bo,Deng Xingliang,et al.The physical simulation research of full diameter core for different development way of fractured-Vuggy carbonate gas condemsate reservoir[J].Xinjiang Oil & Gas,2012,8(1):58-61.[肖阳,康博,邓兴梁,等.缝洞型碳酸盐岩凝析气藏不同开发方式全直径物理模拟研究[J].新疆石油天然气,2012,8(1):58-61.]
[5]Peng song,Guo Ping.Physical simulation of exploiting fractured-vuggy carbonate gas condensate reservoirs by water injection[J].Petroleum Geology & Experiment,2014,36(5):645-649.[彭松,郭平.缝洞型碳酸盐岩凝析气藏注水开发物理模拟研究[J].石油实验地质,2014,36(5):645-649.]
[6]Han Jianfa,Song Yubin,Xiong Chang,et al.Production test dynamic and developing technique strategies for the condensate gas of marine carbonate in Tazhong area,Tarim Basin[J].Natural Gas Geoscience,2014,25(12):2047-2057.[韩剑发,宋玉斌,熊昶,等.塔中海相碳酸盐岩凝析气田试采动态特征与开发技术对策[J].天然气地球科学,2014,25(12):2047-2057.]
[7]Dou Zhilin.Development Technology of Carbonate Fractured-vuggy Reservoir in Tahe Oilfield[M].Beijing:Petroleum Industry Press,2012.[窦之林.塔河油田碳酸盐岩缝洞型油藏开发技术[M].北京:石油工业出版社,2012.]
[8]Rong Yuanshuai,Li Xinhua,Liu Xueli et al.Multi-well waterflooding development pattern for carbonate fractured-vuggy reservoir in Tahe Oilfield[J].Petroleum Geology and Rrecovery Efficiency,2013,20(2):58-61.[荣元帅,李新华,刘学利,等.塔河油田碳酸盐岩缝洞型油藏多井缝洞单元注水开发模式[J].油气地质与采收率,2013,20(2):58-61.]
[9]Rong Yuanshuai,Liu Xueli,Luo Juan.Pilot study on water flooding development in multi-well fractured-vuggy reservoir in Tahe Oilfield[J].Oil Drilling & Production Technology,2008,30(4):83-87.[荣元帅,刘学利,罗娟.塔河油田碳酸盐岩缝洞型油藏多井缝洞单元注水开发试验研究[J].石油钻采工艺,2008,30(4):83-87.]
/
〈 |
|
〉 |