A NEW TESTING METHOD OF GAS WELL POTENTIAL:BACKPRESSURE ISOCHRONAL TEST
Received date: 2003-10-20
Revised date: 2004-04-09
Online published: 2004-10-20
唐俊伟, 马新华, 焦创斌贝, 范丽宏 . 气井产能测试新方法――回压等时试井[J]. 天然气地球科学, 2004 , 15(5) : 540 -544 . DOI: 10.11764/j.issn.1672-1926.2004.05.540
The single-point potential test has two merits. One is that in needs a short test time. Another is that the quantity of relief gas is small. But it will cause a great error in evaluating a low permeability gas well productivity because the gas well will cost a long time to reach a pseudo steady state. To resolve the problem, based on backpressure test theory and superposition principle, this paper designed a new test method, named Backpressure Isochronal Test. It can accurately evlauate the productivity of gas wells with low permeability in a short test time which approximately equals to the time the single-point method needs. The analysis and contrast of analog wells reveal that the result is reliable.
[1]王呜华.气藏工程[M].北京:石油工业出版社,1997.
[2]杨继盛.采气工艺基础[M].北京:石油工业出版社,1992.
[3]《试井手册》编写组.试井手册(下)[S].北京:石油工业出版社,1992.
[4]Brar G S, Mattar L. Authors’reply to discussion of analysis of modified isochronal tests to predict the stabilized deliverability potential of gas wells without using stabilized flow[J]. JPT, 1987,(1): 89-92.
[5]李跃刚,范继武,李静群.一种改进的修正等时试井分析方法[J].天然气工业,1998,18(5):56-58.
[6]郝玉鸿,陈调胜.对气井二项式系数B的新认识[J].天然气工业,2002,22(6):17-23.
/
〈 |
|
〉 |