[1]Economides M J.油藏增产措施[M].北京:石油工业出版社,2002.
[2]Giger F M.Low-Permeability Reservoirs Development Using Horizontal Wells[R].SPE 16406, 1985.
[3]Renard G,Dupuy J M.Formation Damage Effects on Horlzontal Well Flow Efficiency[J].Journal of Petroleum Technology,1991,43(7):786-789.
[4]Gringarten A C,Ramey H J Jr.The Use of Source and Green’s function in Solving Unsteady-Flow Problems in Reservoirs[J].SPE Journal,1973:285-296.
[5]Soliman M Y, Hunt James, Ej Rabaa A M.Fracturing Aspects of Horizontal Wells in Naturally Fractu-red Reservoir[R].SPE 18302, 1988.
[6]Muskat M.Flow of Homogeneous Fluids Through Porous Media[M].Graw Hill Book Co.Inc New York,1937:409.
[7]Joshi S D.Horizontal Well Technology[M].Tulsa:Penn Well Publlshing Company, 1991.
[8]郎兆新,张丽华.压裂水平井产能研究[J].石油大学学报,1994,18(2):43-46.
[9]程林松,李春兰,郎兆新,等.分支水平井产能的研究[J].石油学报,1995,16(2): 49-55.
[10]宁正福,韩树刚,程林松,等.低渗透油气藏压裂水平井产能计算方法[J].石油学报,2002,23(2):68-71.
[11]王晓冬,张义堂,刘慈群.垂直裂缝井产能及导流能力优化研究[J].石油勘探与开发,2004,31(6):78-81.
[12]王晓冬,于国栋,李治平.复杂分支水平井产能研究[J].石油勘探与开发,2006,33(6): 729-733.
[13]张义堂,刘慈群.垂直裂缝井椭圆流模型近似解的进一步研究[J].石油学报,1996,17(4):71-77.
[14]范子菲,方宏长,牛新年.裂缝性油藏水平井稳态解产能公式研究[J].石油勘探与开发,1996,23(3):52-63.
[15]张学文,裘怿楠.低渗透率油藏压裂水平井产能影响因素[J].石油学报,1999,20(4):51-55.
[16]Ozkan E,Raghavan R.New Solutions for Well-Test-Analysis Problems:Part 1-Analytical Considerations[R].SPE 18615,1991.
[17]Riley M F.Analytical Solutions for Elliptical Finite-Conductivity Fractures[R].SPE 22656, 1991.
[18]Cinco-Ley, Samaniego V, Dominguez.Transient Pressure Behavior of a Well With a Finite-Conductivity Vertical Fracture[R].SPE 6014, 1978.
[19]江厚顺,白彦华,冉建立.水平井产能预测及射孔参数优选系统研究[J].天然气地球科学,2007,18 (6):891-893.
[20]相建民.塔里木油田水平井优化设计方法及跟踪效果评价[J].天然气地球科学,2006,17(4):435-438. |