Analysis of the Effect of Gas Recovery Test on the VelocityPipe String of Tazhong Gasfield,Tarim Basin
Received date: 2015-01-21
Revised date: 2015-11-16
Online published: 2015-11-20
Tazhong Gasfield located in the hinterland of Taklimakan Desert.The main development series are the carbonate reservoir in the Upper Ordovician Lianglitage Formation and the Lower Ordovician Yingshan Formation.The gasfield has active edge-bottom water,and failure development pattern.At present there are 126 wells and gasfields.With the decrease of formation energy,the well fluid energy drops,and the wellbore is full of fluid,affecting the normal production of gas well,which seriously affected the efficient development of gasfield.According to the investigation,the coiled tubing speed string can solve the problem of shaft tower gas effusion.As the first coiled tubing speed string drainage gas recovery test in the Tarim Oilfield,well D2 acquired a certain increasing yield.The tests obtained some preliminary achievements.This technology can solve the problem of single well wellbore effusion in the gasfield in the Tazhong.
Key words:
Wellbore effusion; Coiled tubing string; Formation energy
SONG Yu-bin,QI Ying-hui,ZHANG Long,WANG Zhan-gang,YANG Lei . Analysis of the Effect of Gas Recovery Test on the VelocityPipe String of Tazhong Gasfield,Tarim Basin[J]. Natural Gas Geoscience, 2015 , 26(S2) : 198 -201 . DOI: 10.11764/j.issn.1672-1926.2015.S2.0198
[1]Li Chuanliang.Gas reservoir water influx calculation method[J].Xinjiang Petroleum Geology,2003,24(3):430-431.[李传亮.气藏水侵量的计算方法研究[J].新疆石油地质,2003,24(3):430-431.]
[2]Li Min,Sun Lei,Li Shilun.A new continuous drainage wells model[J].Natural Gas Industry,2001,21(5):61-63.[李闽,孙雷,李士伦.一个新的气井连续排液模型[J].天然气工业,2001,21(5):61-63.]
[3]Zhong Xiaoyu,Yan Guangzong,Huang Yan,et al.Technology of gas recovery by water drainage for deep wells with coiled tubing[J].Natural Gas Industry,2005,25(1):111-113.[钟晓瑜,颜光宗,黄艳,等.连续油管深井排水采气技术[J].天然气工业,2005,25(1):111-113.]
[4]He Zhixiong,Sun Lei,Liu Hongyu,et al.Condensate wells to determine a reasonable diameter[J].Natural Gas Industry,2008,28(10):90-91.[何志雄,孙雷,刘宏宇,等.凝析气井合理管径的确定[J].天然气工业,2008,28(10):90-91.]
[5]Alexader Saslaworsky.Coiled tubing operations and use[J].Intelligence Oil Production Technology,1997,2:47-55.[Alexader Saslaworsky.连续油管作业及使用[J].采油工艺情报,1997,2:47-55.]
/
| 〈 |
|
〉 |