Received date: 2012-12-08
Revised date: 2013-01-25
Online published: 2013-10-10
Gas storage group has been gradually carried out in various parts of construction work in Huabei Oilfield.Optimization of injection-production well tubing string is to ensure the safe operation of gas storage.Based on the gas reservoir injection-production program,this paper analyzed injection-production capacity,liquid loading situation and erosion situation for the different pipe diameters,then optimized injection-production well pipe diameter.This paper considers the impact of temperature and pressure,calculated pipe string force,and thus preferred a string steel level.The method of tubing string optimization has been used in the gas storage injection and production wells.
YU Gang,DU Jing-wei,ZOU Xiao-yan,ZHAO Xin,DI Peng . Tubing String Optimization Study of Huabei Gas Storage[J]. Natural Gas Geoscience, 2013 , 24(5) : 1086 -1090 . DOI: 10.11764/j.issn.1672-1926.2013.05.1086
[1]Wang Jieming,Zhang Yuwen,Ding Guosheng,et al.Methods of rebuilding well REN-11 buried hill oil reservoir as underground gas storage[J].Natural Gas Geoscience,2004,15(4):406-411.[王皆明,张昱文,丁国生,等.任11井潜山油藏改建地下储气库关键技术研究[J].天然气地球科学,2004,15(4):406-411.]
[2] Wang Jieming,Jiang Fengguang.A method for calculating the capacity in the fracturing and water-bearing structure as underground gas storage[J].Natural Gas Geoscience,2007,18(5):771-772.[王皆明,姜凤光.裂缝性潜山含水构造改建地下储气库库容计算方法[J].天然气地球科学,2007,18(5):771-772.]
[3] Zhao Shudong,Wang Jieming.Injection-Production Technology for Underground Gas Storage[M].Beijing:Petroleum Industry Press,2000:12-17.[赵树栋,王皆明.天然气地下储气库注采技术[M].北京:石油工业出版社,2000:12-17.]
[4] Li Guotao.Washed out question study for injection-production completion well as underground gas storage[J].Small Oil and Gas Reservoir,2006,11(1):23-30.[李国韬.地下储气库注采井完井冲蚀问题初探[J].小型油气藏,2006,11(1):23-30.]
[5] Yang Jisheng.The Basic Technology of Gas Production[M].Beijing:Petroleum Industry Press,1992:10-11,22-23.[杨继胜.采气工艺基础[M].北京:石油工业出版社,1992:10-11,22-23.]
[6] Hou Guangwen.The usage of completion string force calculation and analysis for the gas injection wells[J].Oil Driling & Production Technology,1991,9(5):2-9.[侯广文.完井管柱受力计算与分析在注气井的应用[J].石油钻采工艺,1991,9(5):2-9.]
[7] Luo Yingjun,Wan Renpu.Handbook of Petroleum Production Technology[M].Beijing:Petroleum Industry Press,2005:15-20.[罗英俊,万仁溥.采油技术手册[M].北京:石油工业出版社,2005:15-20.]
[8] Jin Yequan,Liao Ruiquan,Mei Ping.Design and safety check of gas injection string with high pressure[J].Natural Gas Industry,2005,25(3):96-98.[金业权,廖锐全,梅平.高压注气管柱的设计和强度校核研究[J].天然气工业,2005,25(3):96-98.]
/
〈 |
|
〉 |