A New Forecasting Method for Production with Changing of Water-cut at the Water Flooding Stage

Expand
  • (1. School of Energy Resources, China University of Geosciences, Beijing 100083, China; 
    2. Exploration and Production Research Institute, SINOPEC, Beijing 100083, China)

Received date: 2008-11-24

  Revised date: 2009-06-17

  Online published: 2009-10-10

Abstract

The factors of production decline are different at the reservoir development stages, and water cut is more influence on the production at the flooding stage. Based on the trend analysis of the product of the three, water cut, oil bearing, and cumulative production fluid, we form a new forecasting method of reservoir production at the flooding stage, combining the calculation of reasonable injection production ratio and the water cut optimization of the stage. This method supports the development of adjustment for reservoir without numerical simulation in practice.

Cite this article

LAI Feng-Feng, LI Chi-Beng, CEN Fang . A New Forecasting Method for Production with Changing of Water-cut at the Water Flooding Stage[J]. Natural Gas Geoscience, 2009 , 20(5) : 827 -830 . DOI: 10.11764/j.issn.1672-1926.2009.05.827

Outlines

/