NUMERICAL SIMULATION STUDY AND DEVELOPMENT MEANING OF CHANG 1 RESERVOIR IN DING 31 WELL AREA OFYOUFANGZHUANG OIL FIELD IN ORDOS BASIN
Received date: 2004-05-30
Revised date: 2004-07-29
Online published: 2004-10-20
Through fine geologic modeling of Chang 1 reservior of Ding 31 well area in Youfangzhuang oil field, numerical modeling is set on geologicreserve, oil production, watercut and pressure in the area. On this basis, residual oil distribution is researched, mainly on structurally high part, main channel deposits not flooded, oil sewed semidiameter of well and production well which is not perforation.To various distribution patterns of residual oil,3 methods are developed to production adjustment, including new adjustation well and sidetracking of old wells, perfection of injection-production pattern, production engineering potential development. The estimation of production index indicates that numerical modeling and production adjustment are effective.
QIN Bai-ping,Lü Xiu-xing,ZHANG Zhen-hong,WAN Xiao-long . NUMERICAL SIMULATION STUDY AND DEVELOPMENT MEANING OF CHANG 1 RESERVOIR IN DING 31 WELL AREA OFYOUFANGZHUANG OIL FIELD IN ORDOS BASIN[J]. Natural Gas Geoscience, 2004 , 15(5) : 531 -535 . DOI: 10.11764/j.issn.1672-1926.2004.05.531
[1]张树宝,姚光明,董志清.关于剩余油饱和度分析的研究方法[J].断块油气田,2000,7(3):19-22
[2]乐友喜,王才经.利用分形条件模拟和流线模型预测剩余油气饱和度分布[J].天然气地球科学,2004,15(1):42-46
[3]陈子恩.油气勘探决策第三模拟[J].天然气地球科学,1991,2(2):78-82.
[4] Yuding,Luceweill.油藏数值模拟时的井模型[A].陈路原.国外油田开发技术文集[C].北京:石油工业出版社,2001.107-116.
[5]黄伏生,赵永胜.高含水期砂岩油田细分注水最佳分级模拟研究[J].断块油气田,1999,6(2):42-45.
[6]刘斌,贝东.异常地层压力数学模型的建立[J].天然气地球科学,1995,6(1):34-42.
[7]李福垲.黑油和组分模型的应用[M].北京:科学出版社,1996.77-78.
[8]吴湘.油藏模拟应用技术[J].石油勘探与开发,1991,(1):70-78.
/
〈 |
|
〉 |